Tim Kelley, Warehouse Manager, 12 years on the team

Made for Pros by Pros

Built in Davison, Michigan by people who take the work as seriously as you do.

Tyrone Washington, Blue Line Operator, 10 years on the team

60 years of reliability

For over six decades, Fernco has been at the forefront of delivering innovative, top-quality products tailored for professionals in plumbing, waste and water management, industrial, and beyond.

Our commitment to excellence extends beyond just products; it’s ingrained in our culture, honoring the hardworking men and women who uphold our standards day in and day out.

The people behind the product

At Fernco, we recognize that our employees are the cornerstone of our success. That’s why we prioritize providing a supportive, respectful, collaborative, and transparent work environment.

Brandon Bradley, Process Technician, 20 years on the team
Jason Arnott, Warehouse Consolidator, 5 years on the team
Al St. John, Warehouse Consolidator, 24 years on the team

Driven by this ethos, many of our team members boast over 10 years of industry experience. This longevity isn’t a coincidence; it’s a testament to the caliber of professionals we attract and retain.

Redefining the future of innovation and leadership in the industry: Bianca Perez, Customer Service Manager, and Melissa Glenn, Training Coordinator

From our dock to your job site

Our Made for Pros by Pros campaign celebrates these dedicated individuals who pour their expertise into crafting top-notch products, from our dock to your installation site.

Kyle Manns, Process Technician, 8 years on the team
The performance you expect meets the quality you deserve: Keith Scrimger, Machinist

American made

We take pride in being a U.S. manufacturer committed to maintaining the highest standards of quality, with no shortcuts, surprises, or compromises.

Whether you’re installing a custom large diameter RC coupling for a stormwater drainage system or connecting 2″ plastic to existing 3″ cast iron waste pipe, rely on Fernco’s proven solutions that have stood the test of time for over 60 years.

AIS and BABA compliance →

Built here since 1964

A few milestones from six decades of making connections.

  1. 1964Fernco is founded.
  2. 1973The first Fernco flexible coupling goes to market, on a bid from Dallas, Texas.
  3. 1977Fernco moves from Ferndale to Davison, Michigan.
  4. 1995Fernco achieves ISO 9000 quality certification.
  5. 2016A 155,000 sq. ft. manufacturing and distribution center opens in Davison.
  6. 2026AIS and BABA compliance expands across core repair coupling lines.
Our full history →
The pros in the field

Made for pros like them

Our ambassadors are plumbers and contractors who use Fernco on the job and share their work with the trades online.

Meet our ambassadors

Join the team

We’re hiring in Davison, Michigan. Come build what the trades rely on.